Administrative
complex situated in phase (1) of the project with a total roof
area of (2075) m2.
|
 |
(122)
Investment plots distributed over (9) investment sectors for phase (1) of
the project, (152) investment plots distributed over (12) investment sectors
for phase (2) of the project, and (91) investment plots distributed over (8)
investment sectors for phase (3) of the project.
|
 |
Integrated
networks of primary and secondary roads of different widths with
a total length of (15 357) m and a total paved area of (162 600)
m2 for all 3 phases.
|
 |
Integrated
infrastructure networks (water, storm, sewerage, electricity, street
lighting, communications and fire hydrants) for each phase of the project.
|
 |
Activated
sludge “Extended Aeration” wastewater treatment plant
situated in the northeast part of the project where the dominant
wind direction is western to southwestern.
|
 |
45-meter
high reinforced concrete elevated water tank with a storage
capacity of 450 m3.
|
 |
One
reinforced concrete ground water reservoir for each phase of the
project with a capacity of 1500 m3.
|
 |
Allocation
of (23 700) m2 in phase (1) of the project for main
transformer station installation.
|
 |
Allocation
of (3000) m2 in phase (1) of the project for primary
exchange construction.
|
 |
Entrance
gate to phase (1) of the project from the road to jafr and
entrance gate to phase (3) of the project from the road to
Mudawara. |